Storage needed to hold post-development runoff to an allowable release rate, by the modified rational critical-duration method.

PRELIMINARYReference tables are still being checked against their printed sources. How results are checked

Site and release
sf

min

cfs

Intensity-duration tableRainfall intensity for each duration, for the design storm.
in/hr

in/hr

in/hr

in/hr

in/hr

in/hr

in/hr

in/hr

in/hr

in/hr

11,069cf

0.254 ac-ft of storage, at a critical duration of 120.0 min. Preliminary estimate.

Critical duration
120.0 min
Intensity at that duration
1.04 in/hr
Inflow Cf · C · i · A
1.70 cfs
Average outflow ratio k
0.67
Storage
0.254 ac-ft
Show the table
Storage at each duration. The largest is the estimate.
Duration (min)i (in/hr)Inflow (cfs)Storage (cf)
5.07.0011.503,401
10.05.609.205,421
15.04.677.676,751
30.03.115.118,902
60.01.873.0710,442
120.01.041.7011,069
180.00.721.1810,941
360.00.370.619,651
720.00.190.316,321
1,440.00.100.160

The link carries these inputs, not the answer.

Worked example

The default inputs above are a published example: NYC DEP 2012 Example 1A (Bronx, orifice): C 0.768, 93,200 sqft, 0.25 cfs, with NYC's 10-yr IDF i = 140/(t + 15) at the NOAA durations. NYC prints 10,895 cf from its rounded closed form (0.19 for 0.19284); the exact form is about 1.5 percent higher..

  1. Outflow assumption: NYC DEP Criteria for Detention Facility Design (2012) § I p. 3: k = 2/3
  2. Critical duration t = 120.0 min, i = 1.04 in/hr
  3. Inflow = C × i × A = 0.768 × 1.04 in/hr × 93,200 sf = 1.70 cfs
  4. V = 60 × 120.0 × (1.70 − 0.67 × 0.25) = 11,069 cf (0.254 ac-ft)

The formula

V(t) = 60 t · (Cf · C · i(t) · A − k · Qo); V = max over t ≥ Tc

NYC DEP Criteria for Detention Facility Design (2012) pp. 1 to 4; UDFCD Drainage Criteria Manual Vol. 2 (2007) eq. SO-6 to SO-10. A preliminary estimate, not a NYSDEC method.

V(t)
storage needed for a storm of duration t, cf
t
storm duration, searched from Tc upward, min
i(t)
rainfall intensity for that duration, in/hr
C
runoff coefficient (Cf · C when a frequency factor applies)
A
drainage area, ac
Qo
allowable release rate, cfs
k
average outflow over the storm as a share of Qo

A preliminary estimate, not a NYSDEC method

The critical-duration method sizes one level of peak control for one release rate. It does not route a hydrograph through an outlet, and it cannot represent a multi-stage riser. NYC DEP uses it for on-site detention to the city sewer. The New York design manual names TR-55 and TR-20 for the peak rates its criteria check, and no NYSDEC statement on this method was found either way. Use it to get a first pond size, then route the design storm.

The three outflow assumptions

  • NYC DEP 2012 § I p. 3: k = 2/3, orifice under rising head
  • NYC DEP 2012 § II p. 4: k = 0.95, near-constant outflow
  • UDFCD 2007 eq. SO-7: m = ½(1 + Tc/T), 0.5 to 1

Questions about this calculation

What is the critical storm duration?
The storm duration that makes inflow volume minus outflow volume largest for a fixed release rate. That largest difference is the storage estimate.
NYC DEP Criteria for Detention Facility Design (2012) pp. 3 to 4; UDFCD DCM Vol. 2 (2007) p. SO-11
What average outflow does the method assume?
NYC DEP takes 2/3 of the maximum release for an orifice under rising head and 95% for a pump. UDFCD uses m = ½(1 + Tc/T), between 0.5 and 1.
NYC DEP (2012) pp. 3 to 4; UDFCD eq. SO-7
Does it work for multi-stage outlets?
No. It sizes one level of peak control only.
UDFCD DCM Vol. 2 (2007) p. SO-10
Does NYSDEC accept the modified rational method?
No NYSDEC statement was found either way. The design manual names TR-55 and TR-20 for the peak rates behind its criteria.
NYSDEC DM2024 § 4.6
How accurate is the TR-55 storage chart by comparison?
TR-55 says not to use its Figure 6-1 for final design if a 25% storage error cannot be tolerated.
TR-55 (1986) p. 6-3

The other calculators

How results are checkedPricing for the full app

The full app runs the whole site: Atlas 14 rainfall frozen for the project, pre and post hydrographs, and the pond routed through its outlets. Then the NYSDEC checks you select, and a PDF report with the SWMM file a reviewer can rerun.